Project approved by the municipality of Faro for the construction of a hotel with 146 rooms, an aparthotel with 83 apartments and a 9-hole golf course, just 10 minutes from the historic center of Faro, the beach and the international airport, in the district capital. The size of the plot is around 146,915m², including the implementation of a Hotel with 8327m². The Apart-Hotel will have 83 Apartments and 146 Hotel Rooms. The value of the fee for issuing the building permit is around 170,000 EUR. As for the transfers to be provided to the Municipality of Faro, the amount is 665,000 Description of the project The project presented proposes to change the interiors of the rooms, reconfiguring their space so that we can have more accommodation units, however, this change does not change anything the maximum amount provided for in the PDM - 160 beds distributed among the 83 accommodation units. These 83 AU, They consist of 77 double T1 and 6 single T1s, 2 of which are adapted to mobile users Conditioned. The -3 floor remains, and will be characterized by common areas with parking spaces, 5 reserved for users with reduced mobility (CMU), reception of conference rooms, conference, gender-divided toilet facilities to support conference rooms and service areas which contains technical areas, bicycle storage, garbage deposit, linen, storage and kitchen to support the conference rooms. On the -2 floor, the common areas remain unchanged, and we will have the entrance hall, reception, bar, gourmet restaurant, main restaurant with open kitchen, asian restaurant with kitchen and bar, sanitary facilities divided by sex, one of which is adapted to users of Disabled Mobility, Living Room, Library, Internet, Café, Shop, Performance Venue, Ticket Office, bar, another block of sanitary facilities, one of which is adapted for mobility users Conditioned, dance floor with bar. The accommodation units have undergone a change of 7UA (5 double T1 and 2 T2 Double), to 9UA (9 T1 Double). As service areas we have a kitchen to support the restaurants (pantries, pantries, economatos, preparation areas), floor pantry, security, garbage deposit, staff canteen, toilets/changing rooms/changing rooms for female and male staff, areas Anabela Polido Macieira / KEY Zen Arquitetura, Lda / + / + / (email) Technical, archive, storage rooms, pantries, technical areas, support for the venue and disco (sanitary facilities, staff room, kitchen, rehearsal room, backstage, wine cellar). On the -1 floor as common areas are projected 2 shops, hairdresser, SPA with reception, facilities toilets for both sexes, caldarium, relaxation room, therapy room, steam rooms, hamam, semi-indoor pool, jacuzzi, dead sea, bar, whirlpools, saunas, I. S. UMC, rooms Asian massage rooms, indoor children's pool, indoor golf room, games room, gyms with rooms massage and toilet/changing facilities (M/F/UMC), children's area, upper floor of the show, toilets to support the outdoor swimming pool, storage area for bugies, I. S. Changing rooms/changing rooms M/F/UMC. In the service areas we have sanitary facilities to support the service (M F), pantries, towel service, kitchen to support the semi-covered pool bar, ticket office dispensary, archive, laundry area, 1st aid area, storage, technical areas, golf shop storage room, storage of tools and floor pantries. The accommodation units have undergone a change of 15 AU (13 T1 double and 2 T2 double), for 18 AU (1 T1 single and 17 T1 double). On floor 0 as common areas we will have the entrance hall, reception, sanitary installation (M/F/UMC), and the accommodation units that have gone from 27 UA (20 T1 doubles, of which 3 are adapted to UMC, 6 T2 double + single and 1 T3 + 2 double + single) to 33 UA (4 T1 singles, of which 2 are adapted to UMC, and 29 T1 doubles). The 1st floor is destined, as common areas, to a restaurant-terrace, bar, in terms of service areas contains the kitchen, pantries, storage, floor pantry and furniture storage. The units of Accommodation has gone from 18 UA (13 T1 double of which 3 are adapted to UMC, 2 T2 double, 2 T2 double + single and 1 T3+2 double + single), to 23 AU (1 T1 single and 22 T1 double). All architectural changes presented comply with Decree Law 163/2006, of 8 August. Hotel Rating & Capacity With regard to the hotel's capacity, it was intended not to exceed what is regulated in Article 22 - E, provisions of the Regulation of the Municipal Master Plan of Faro, with the current wording, as well as the previous proposal, with a maximum capacity of 160 beds (respected and maintained, as in the project and 152 convertibles, spread over 83 accommodation units (77 T1 double apartments and 6 T1 single apartments, 2 of which are adapted for disabled users). With the change from 67 AU to 83 AU, the changes carried out were mainly at the interior and its reorganization, as well as at the level of the facades. There was only the alteration of Building V on the 1st Floor, converting the covered terrace area into a closed construction area, in order to expand the rooms, thus eliminating the terrace. This change was accounted for in 42.02m². There was not, in the However, any change in the building's location, as well as waterproofing, remained all its configuration and footprint unchanged. This adjustment in terms of typologies remains in line with the above-mentioned Decree Law The property has an incredible pine forest, ideal a 9-hole golf course and an artificial lake or ecological pool. Faro Airport and a heliport are just over 10 minutes away.